Contract Award Notice
Country: Republic of Armenia
Project: North-South Road Corridor Investment Program -Tranche 4
|
Scope of Contract: |
Preparation of Detailed Design, Land Acquisition and Resettlement Plan of about 32 km road from Agarak to tunnel exit; and Preparation of Detailed Design, Land Acquisition and Resettlement Plan of about 7 km road from tunnel entrance to Qajaran and about 6 km of the tunnel and access roads (Tranche 4) Contract No. T4-CS-01-D Time duration for implementation of this assignment is 15 months. |
Minimum Qualifying Technical Score: |
75 |
|
Implementation of Author Supervision of about 32 km road from Agarak to tunnel exit Contract No. T4-CS-01-DAS Time duration for implementation of this assignment is 24 months. |
|||
|
|
|
|
|
|
Consultants’ names |
J/V IRD ENGINEERING S.R.L. and GP Ingegneria S.R.L
|
TPF GETINSA-EUROESTUDIOS, S.L and with sub-consultant EA ENERGY ADVISORY, LLC |
Aarvee associates architects engineers & consultants PVT. LTD., with sub-consultant “ARTSAKHROAD” INSTITUTE CJSC |
J/V AIC Progetti S.P.A and TEC INFRASTRUCTURE, with sub-consultant DORPROJECT Institute LLC |
J/V Kocks Consult GмBH, Consulting Engineers and Dohwa Engineering Co. Ltd. |
|
|
City/Country |
Italy |
Spain |
India |
Italy |
Germany |
|
|
Status: |
Awarded Consultant/Firm |
Evaluated Consultant/Firm |
Evaluated Consultant/Firm |
Evaluated Consultant/Firm |
Evaluated Consultant/Firm |
|
|
|
||||||
|
Technical Score |
91.97 |
75.74 |
75.30 |
83.90 |
87.87 |
|
|
Financial Score |
85.09 |
43.69 |
100 |
87.80 |
64.40 |
|
|
Combined Score |
90.60 |
69.33 |
80.24 |
84.68 |
83.18 |
|
|
Criteria |
|
|
|
|
|
|
|
Specific experience of the Consultant (as a firm) relevant to the Assignment |
4.5 |
4.8 |
4.5 |
4.5 |
4.8 |
|
|
Adequacy and quality of the proposed methodology, and work plan in responding to the Terms of Reference (TORs) |
29.4 |
21.6 |
20.4 |
24.3 |
28.5 |
|
|
Key Experts’ qualifications and competence for the Assignment |
57.58 |
49.34 |
50.05 |
54.56 |
52.95 |
|
|
Participation by nationals among proposed Key Staff |
0.49 |
0.0 |
0.35 |
0.54 |
1.62 |
|
|
|
|
|
|
|
|
|
|
Price as read out |
EUR 1,943,300.00 AMD 83,640,000.00 (local taxes exclusive) |
EUR 2,825,295.75 AMD 1,090,531,200.00 (local taxes exclusive) |
USD 2,251,170.00 AMD 77,745,500.00 (local taxes exclusive) |
USD 1,827,500.00 AMD 445,350,000.00 (local taxes exclusive) |
USD 3,744,526.00 (local taxes exclusive) |
|
|
Final Evaluation Price |
AMD 1,373,423,207.0
|
AMD 2,674,928,803.642
|
AMD 1,168,594,946.9
|
AMD 1,330,901,675.0
|
AMD 1,814,484,963.82
|
|
|
Final Negotiated Price |
EUR 1,943,300.00 AMD 283,640,000.00 (local taxes exclusive) |
Not Applicable |
Not Applicable |
Not Applicable |
Not Applicable |
|
|
|
|
|
|
|
|
|
|
Rank |
1 |
5 |
4 |
2 |
3 |
|
Other Shortlisted Consultant(s)/Firm(s)
|
Consultants’ names |
J/V Egis International and ILF Consulting Engineers Polska Sp. z o.o. (“ILF”) |
|
City/Country |
France
|
|
Proposal Submitted: |
No |