Construction of the surface spillway of Kambaratinskaya Hydroelectric Power Plant No. 2

State

Kyrgyz Republuc

Sector

No information

Approval year

2023

Total project cost

56.8

Funding organizations

Eurasian Fund for Stabilization and Development

Improving the energy security of the Kyrgyz Republic

• Ensuring the safe operation of Kambaratinskaya HPP-2 by reducing the risk of the devastating effects of heavy floods on the dam

• Improving the reliability and stability of electricity supply to consumers and the efficiency of using the Naryn River's hydropotential

Project description

Key project effects:



• The construction of an additional surface spillway at Kambaratinskaya HPP-2 will increase the capacity of spillway facilities



• This, in turn, will ensure the safe and reliable operation of the dam and facilities of the Kambaratinskaya HPP-2



• As a result, the country's energy security will be enhanced as an effect of the project.



Project Description:



Construction work on the construction of a surface spillway. Additional engineering and geological surveys and research


Similar projects