Construction of the Kajaran Tunnel

State

Republic Armenia

Sector

No information

Approval year

2024

Total project cost

400

Funding organizations

Eurasian Fund for Stabilization and Development

It is a direct continuation of the current EFSD project "Construction of the North—South highway corridor" (4th stage)

Project description

Key project effects:



• Significant increase in road safety

when passing the Meghri pass



• Reduction of the passage time of this section of the road corridor

"North — South" by 50% and an increase in the average speed on it from 50 km/h

up to 80 km/h



• Increase the potential of transit traffic and reduce accidents

on the section of the North—South road corridor



Project Description:



Construction of a 7.2 km long automobile tunnel bypassing the city of Kajaran and the Meghri pass and access roads to it


Similar projects